Penmann recently finalised a significant HVAC upgrade at Nutricia’s Liverpool facility, implementing a bespoke ventilation and climate control system designed to satisfy stringent hygiene and production requirements. The project included the complete lifecycle delivery of high-specification HVAC systems across civil, Medium Care (MC) and High Care (HC) areas. Based on https://zbookmarkhub.com/story20808117/penmann-completes-specialist-hvac-installation-for-the-liverpool-based-nutricia-facility-in-line-with-fsi-phase-1-and-2